All:<br><br>As I see it, there are several major steps that must proceed in order to get us to a point where smaller improvements to the space can proceed in parallel and by individuals.<br><ol><li>The shelves which were taken out by the previous tenant need to be degrimed and the very tops need the nails taken out</li>
<li>The shelves still in place in the storage room need to be cleaned/sterilized</li><li>Both installed and non-installed shelves need to be primed (with Kilz) and painted.</li><li>Non-installed shelves need to be put in place</li>
<li>Prime (with Kilz) and paint the storage room loft floor</li><li>Materials from the main floor need to be put away into the storage room</li></ol><br>At that point we should have plenty of space in the main room to create worktables and set up shop.  These actions should be priority, but several things[1] can parallel.<br>
<br>The first two items can be taken on by whomever is there and wants to work on something.  I&#39;ll grab the Kilz and paint in the next couple of days, and hopefully by next weekend we&#39;ll be ready to store everything that goes into the storage room.<br>
<br>[1]  Such as <b>sanely</b> running Cat-6, cleaning the office loft, steam cleaning the rug, continuing backyard clearing, clearing fence on North side, etc.<br><br><br>Bob<br>(korc)<br>