Speaking of the meeting....<br><br>I know we discussed this topic last Saturday.  Are we having the meeting at the new shop, or the old one?  I wanted to make sure, and it would have the handy side affect of letting those who were not there <br>
<br>-Jake<br><a href="http://www.phalinsworkshop.com">www.phalinsworkshop.com</a><br><br><br><div class="gmail_quote">On Mon, Apr 20, 2009 at 1:52 PM, Brian Walker <span dir="ltr">&lt;<a href="mailto:misterworld@gmail.com">misterworld@gmail.com</a>&gt;</span> wrote:<br>
<blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">I&#39;ve got some cleaning supplies and gloves I&#39;ll bring to the meeting Tuesday.  I can bring my pressure washer too, if we think it&#39;s necessary.<br>
<br><div class="gmail_quote"><div><div></div><div class="h5">On Mon, Apr 20, 2009 at 12:53 PM, Bob <span dir="ltr">&lt;<a href="mailto:themostbob@gmail.com" target="_blank">themostbob@gmail.com</a>&gt;</span> wrote:<br>
</div></div><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;"><div><div></div><div class="h5">All:<br><br>As I see it, there are several major steps that must proceed in order to get us to a point where smaller improvements to the space can proceed in parallel and by individuals.<br>

<ol><li>The shelves which were taken out by the previous tenant need to be degrimed and the very tops need the nails taken out</li>
<li>The shelves still in place in the storage room need to be cleaned/sterilized</li><li>Both installed and non-installed shelves need to be primed (with Kilz) and painted.</li><li>Non-installed shelves need to be put in place</li>


<li>Prime (with Kilz) and paint the storage room loft floor</li><li>Materials from the main floor need to be put away into the storage room</li></ol><br>At that point we should have plenty of space in the main room to create worktables and set up shop.  These actions should be priority, but several things[1] can parallel.<br>


<br>The first two items can be taken on by whomever is there and wants to work on something.  I&#39;ll grab the Kilz and paint in the next couple of days, and hopefully by next weekend we&#39;ll be ready to store everything that goes into the storage room.<br>


<br>[1]  Such as <b>sanely</b> running Cat-6, cleaning the office loft, steam cleaning the rug, continuing backyard clearing, clearing fence on North side, etc.<br><font color="#888888"><br><br>Bob<br>(korc)<br>
</font><br></div></div>_______________________________________________<br>
General mailing list<br>
<a href="mailto:General@lists.makerslocal.org" target="_blank">General@lists.makerslocal.org</a><br>
<a href="https://lists.makerslocal.org/mailman/listinfo/general" target="_blank">https://lists.makerslocal.org/mailman/listinfo/general</a><br>
<br></blockquote></div><br>
<br>_______________________________________________<br>
General mailing list<br>
<a href="mailto:General@lists.makerslocal.org">General@lists.makerslocal.org</a><br>
<a href="https://lists.makerslocal.org/mailman/listinfo/general" target="_blank">https://lists.makerslocal.org/mailman/listinfo/general</a><br>
<br></blockquote></div><br><br clear="all"><br>-- <br>Jake Polatty, KI4BTJ<br><br>