I've got some cleaning supplies and gloves I'll bring to the meeting
Tuesday. I can bring my pressure washer too, if we think it's necessary.
On Mon, Apr 20, 2009 at 12:53 PM, Bob <themostbob at gmail.com> wrote:
> All:
>
> As I see it, there are several major steps that must proceed in order to
> get us to a point where smaller improvements to the space can proceed in
> parallel and by individuals.
>
> 1. The shelves which were taken out by the previous tenant need to be
> degrimed and the very tops need the nails taken out
> 2. The shelves still in place in the storage room need to be
> cleaned/sterilized
> 3. Both installed and non-installed shelves need to be primed (with
> Kilz) and painted.
> 4. Non-installed shelves need to be put in place
> 5. Prime (with Kilz) and paint the storage room loft floor
> 6. Materials from the main floor need to be put away into the storage
> room
>
>
> At that point we should have plenty of space in the main room to create
> worktables and set up shop. These actions should be priority, but several
> things[1] can parallel.
>
> The first two items can be taken on by whomever is there and wants to work
> on something. I'll grab the Kilz and paint in the next couple of days, and
> hopefully by next weekend we'll be ready to store everything that goes into
> the storage room.
>
> [1] Such as *sanely* running Cat-6, cleaning the office loft, steam
> cleaning the rug, continuing backyard clearing, clearing fence on North
> side, etc.
>
>
> Bob
> (korc)
>
> _______________________________________________
> General mailing list
> General at lists.makerslocal.org
> https://lists.makerslocal.org/mailman/listinfo/general
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.makerslocal.org/pipermail/general/attachments/20090420/4a019bc7/attachment.htm>
More information about the General
mailing list